POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Arven South Offshore Wind Farm

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:bd7842e017a99d8288c526e8 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:fad5c76e6fb63045fd579b95
to_kindpower_object
to_idneso:connection_site:bd7842e017a99d8288c526e8
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:85

Sources EV-ea4cfbc76537fe43193ef8d7
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 611a18f1ec9c9efbc6288c0ba487da0d54f327b558137c7cee98ccfe4a8efee2

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Arven South Offshore Wind Farm

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-ea4cfbc76537fe43193ef8d7
MW Increase / Decrease500 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-ea4cfbc76537fe43193ef8d7
Cumulative Total Capacity (MW)500 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-ea4cfbc76537fe43193ef8d7
Detailed source fields
Original source fieldPublished value or condition
Project NameArven South Offshore Wind Farm
Customer NameARVEN SOUTH LIMITED
Connection SiteNorthern Shetland 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease500.00
Cumulative Total Capacity (MW)500.00
MW Effective From2033-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TOSHET
Plant TypeWind Offshore
Project IDa0l8e000001HxQ5AAK
Project NumberPRO-004242
GateNot obtained
Original textScoping
source_record_idcsv:row:85

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:85

Sources EV-ea4cfbc76537fe43193ef8d7
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 611a18f1ec9c9efbc6288c0ba487da0d54f327b558137c7cee98ccfe4a8efee2

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Arven South Offshore Wind Farm

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameArven South Offshore Wind Farm
Customer NameARVEN SOUTH LIMITED
Connection SiteNorthern Shetland 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease500.00
Cumulative Total Capacity (MW)500.00
MW Effective From2033-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TOSHET
Plant TypeWind Offshore
Project IDa0l8e000001HxQ5AAK
Project NumberPRO-004242
GateNot obtained
Original textScoping
source_record_idcsv:row:85

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:85

Sources EV-ea4cfbc76537fe43193ef8d7
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 611a18f1ec9c9efbc6288c0ba487da0d54f327b558137c7cee98ccfe4a8efee2

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel