POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Merthyr Solar and Battery

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:44e11e3458a3e2ba0feeb2f8 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:f51706b4a2f24061ac9bb394
to_kindpower_object
to_idneso:connection_site:44e11e3458a3e2ba0feeb2f8
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1390

Sources EV-9a6af182b2365d54da99fae2
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 b58cc2c8d0b6c34a7794440cecf5c5481e2b1816eaa13fd59e5617a23b644b88

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Merthyr Solar and Battery

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-9a6af182b2365d54da99fae2
MW Increase / Decrease65 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-9a6af182b2365d54da99fae2
Cumulative Total Capacity (MW)175 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-9a6af182b2365d54da99fae2
Detailed source fields
Original source fieldPublished value or condition
Project NameMerthyr Solar and Battery
Customer NameEEW RENEWABLES LTD
Connection SiteCilfynydd 400kV Substation
Stage2.00
MW Connected0.00
MW Increase / Decrease65.00
Cumulative Total Capacity (MW)175.00
MW Effective From2037-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypePV Array (Photo Voltaic/solar)
Project IDa0l8e0000010wfMAAQ
Project NumberPRO-002757-2
GateNot obtained
Original textScoping
source_record_idcsv:row:1390

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1390

Sources EV-9a6af182b2365d54da99fae2
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 b58cc2c8d0b6c34a7794440cecf5c5481e2b1816eaa13fd59e5617a23b644b88

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Merthyr Solar and Battery

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameMerthyr Solar and Battery
Customer NameEEW RENEWABLES LTD
Connection SiteCilfynydd 400kV Substation
Stage2.00
MW Connected0.00
MW Increase / Decrease65.00
Cumulative Total Capacity (MW)175.00
MW Effective From2037-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypePV Array (Photo Voltaic/solar)
Project IDa0l8e0000010wfMAAQ
Project NumberPRO-002757-2
GateNot obtained
Original textScoping
source_record_idcsv:row:1390

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1390

Sources EV-9a6af182b2365d54da99fae2
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 b58cc2c8d0b6c34a7794440cecf5c5481e2b1816eaa13fd59e5617a23b644b88

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel