Evidence relationships · GBR · neso_tec

Burbo Bank Offshore Wind Farm

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:614506862a5e17800395c97c · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:f1e29cda6a4a6da8513aff5c
to_kindpower_object
to_idneso:connection_site:614506862a5e17800395c97c
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:304

Sources EV-52f4a6143145e1b97d171139
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 15841d2c12e48e3a12f57107993e9e32be43b3c9cc61b020bc6a2e35062db435

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Burbo Bank Offshore Wind Farm

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected90 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-52f4a6143145e1b97d171139
MW Increase / Decrease0 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-52f4a6143145e1b97d171139
Cumulative Total Capacity (MW)90 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-52f4a6143145e1b97d171139
Detailed source fields
Original source fieldPublished value or condition
Project NameBurbo Bank Offshore Wind Farm
Customer NameORSTED BURBO (UK) LIMITED
Connection SiteBirkenhead 275kV Substation
StageNot obtained
MW Connected90.00
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)90.00
MW Effective FromNot obtained
Project StatusBuilt
Agreement TypeEmbedded
HOST TONGET
Plant TypeEnergy Storage System;Wind Offshore
Project IDa0l4L0000005iS4QAI
Project NumberPRO-001298
GateNot obtained
Original textBuilt
source_record_idcsv:row:304

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:304

Sources EV-52f4a6143145e1b97d171139
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 15841d2c12e48e3a12f57107993e9e32be43b3c9cc61b020bc6a2e35062db435

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Burbo Bank Offshore Wind Farm

project stage · built

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBurbo Bank Offshore Wind Farm
Customer NameORSTED BURBO (UK) LIMITED
Connection SiteBirkenhead 275kV Substation
StageNot obtained
MW Connected90.00
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)90.00
MW Effective FromNot obtained
Project StatusBuilt
Agreement TypeEmbedded
HOST TONGET
Plant TypeEnergy Storage System;Wind Offshore
Project IDa0l4L0000005iS4QAI
Project NumberPRO-001298
GateNot obtained
Original textBuilt
source_record_idcsv:row:304

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:304

Sources EV-52f4a6143145e1b97d171139
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 15841d2c12e48e3a12f57107993e9e32be43b3c9cc61b020bc6a2e35062db435

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel