POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Navenby GEC (Ethos Green)

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:2decd0819801dfbe7fc91adb · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:eccfd844cad73abe6280813e
to_kindpower_object
to_idneso:connection_site:2decd0819801dfbe7fc91adb
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1490

Sources EV-8aaffe6489ab84a7764e638c
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 776f00d17a3e85dcf525af4531bb72b0b4eaec154819eab088b3b680fd5af9b8

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Navenby GEC (Ethos Green)

Connection register · awaiting consents

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-8aaffe6489ab84a7764e638c
MW Increase / Decrease580 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-8aaffe6489ab84a7764e638c
Cumulative Total Capacity (MW)580 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-8aaffe6489ab84a7764e638c
Detailed source fields
Original source fieldPublished value or condition
Project NameNavenby GEC (Ethos Green)
Customer NameNAVENBY GREEN ENERGY CENTRE LTD
Connection SiteNavenby 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease580.00
Cumulative Total Capacity (MW)580.00
MW Effective From2033-10-30
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e000000f5Y8AAI
Project NumberPRO-003936
Gate1
Original textAwaiting Consents
source_record_idcsv:row:1490

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1490

Sources EV-8aaffe6489ab84a7764e638c
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 776f00d17a3e85dcf525af4531bb72b0b4eaec154819eab088b3b680fd5af9b8

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Navenby GEC (Ethos Green)

project stage · awaiting consents

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameNavenby GEC (Ethos Green)
Customer NameNAVENBY GREEN ENERGY CENTRE LTD
Connection SiteNavenby 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease580.00
Cumulative Total Capacity (MW)580.00
MW Effective From2033-10-30
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e000000f5Y8AAI
Project NumberPRO-003936
Gate1
Original textAwaiting Consents
source_record_idcsv:row:1490

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1490

Sources EV-8aaffe6489ab84a7764e638c
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 776f00d17a3e85dcf525af4531bb72b0b4eaec154819eab088b3b680fd5af9b8

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel