POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Bramford 2 GEC (Ethos Green)

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:da41a5b95c5c487ad13c3733 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:e8a9756cad2816fb16309ea8
to_kindpower_object
to_idneso:connection_site:da41a5b95c5c487ad13c3733
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:254

Sources EV-112eb84158cbb0d07c950ff0
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 b57a7a382fc8f646c28a45c9d84c8c8f5fb22c327473ba6c2599483140be3cf4

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Bramford 2 GEC (Ethos Green)

Connection register · awaiting consents

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-112eb84158cbb0d07c950ff0
MW Increase / Decrease57 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-112eb84158cbb0d07c950ff0
Cumulative Total Capacity (MW)57 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-112eb84158cbb0d07c950ff0
Detailed source fields
Original source fieldPublished value or condition
Project NameBramford 2 GEC (Ethos Green)
Customer NameBRAMFORD 2 GREEN ENERGY CENTRE LTD
Connection SiteBramford 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease57.00
Cumulative Total Capacity (MW)57.00
MW Effective From2032-07-01
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e0000010wO9AAI
Project NumberPRO-002568
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:254

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:254

Sources EV-112eb84158cbb0d07c950ff0
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 b57a7a382fc8f646c28a45c9d84c8c8f5fb22c327473ba6c2599483140be3cf4

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Bramford 2 GEC (Ethos Green)

project stage · awaiting consents

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBramford 2 GEC (Ethos Green)
Customer NameBRAMFORD 2 GREEN ENERGY CENTRE LTD
Connection SiteBramford 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease57.00
Cumulative Total Capacity (MW)57.00
MW Effective From2032-07-01
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e0000010wO9AAI
Project NumberPRO-002568
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:254

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:254

Sources EV-112eb84158cbb0d07c950ff0
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 b57a7a382fc8f646c28a45c9d84c8c8f5fb22c327473ba6c2599483140be3cf4

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel