POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

St Marys Isle Solar Farm

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:faa23172cfc350d673f859a4 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:e881d370ba1fdda5120bf6af
to_kindpower_object
to_idneso:connection_site:faa23172cfc350d673f859a4
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1882

Sources EV-35639c12ef5900c9106fa8e7
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 1d42d6caef049120182ae75bad6ee73ad753f2dcb1e20a596118c9d5a8daa13d

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

St Marys Isle Solar Farm

Connection register · consented

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-35639c12ef5900c9106fa8e7
MW Increase / Decrease36 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-35639c12ef5900c9106fa8e7
Cumulative Total Capacity (MW)36 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-35639c12ef5900c9106fa8e7
Detailed source fields
Original source fieldPublished value or condition
Project NameSt Marys Isle Solar Farm
Customer NameGRUPOTEC SOLAR UK 5 LIMITED
Connection SiteTongland 132/11kV
StageNot obtained
MW Connected0.00
MW Increase / Decrease36.00
Cumulative Total Capacity (MW)36.00
MW Effective From2030-06-14
Project StatusConsents Approved
Agreement TypeEmbedded
HOST TOSPT
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e0000010wiLAAQ
Project NumberPRO-002789
Gate2
Original textConsents Approved
source_record_idcsv:row:1882

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1882

Sources EV-35639c12ef5900c9106fa8e7
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 1d42d6caef049120182ae75bad6ee73ad753f2dcb1e20a596118c9d5a8daa13d

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

St Marys Isle Solar Farm

project stage · consented

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameSt Marys Isle Solar Farm
Customer NameGRUPOTEC SOLAR UK 5 LIMITED
Connection SiteTongland 132/11kV
StageNot obtained
MW Connected0.00
MW Increase / Decrease36.00
Cumulative Total Capacity (MW)36.00
MW Effective From2030-06-14
Project StatusConsents Approved
Agreement TypeEmbedded
HOST TOSPT
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e0000010wiLAAQ
Project NumberPRO-002789
Gate2
Original textConsents Approved
source_record_idcsv:row:1882

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1882

Sources EV-35639c12ef5900c9106fa8e7
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 1d42d6caef049120182ae75bad6ee73ad753f2dcb1e20a596118c9d5a8daa13d

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel