POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

NatPower Allington Green Energy Park

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:9eca113735d1a031e1762f24 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:e742dbe2238a317b5e9db864
to_kindpower_object
to_idneso:connection_site:9eca113735d1a031e1762f24
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1465

Sources EV-e9d2c45a64d9199497362451
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 378bee8f3e55b1c7e6166fac3ea0b6f540e3c7c95c0b3f5d35ceb62e330eaeca

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

NatPower Allington Green Energy Park

Connection register · awaiting consents

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-e9d2c45a64d9199497362451
MW Increase / Decrease1000 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-e9d2c45a64d9199497362451
Cumulative Total Capacity (MW)1000 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-e9d2c45a64d9199497362451
Detailed source fields
Original source fieldPublished value or condition
Project NameNatPower Allington Green Energy Park
Customer NameCOTTOM TO RYHALL ENERGY LIMITED
Connection SiteTrent Valley South Connection Node B 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease1000.00
Cumulative Total Capacity (MW)1000.00
MW Effective From2034-10-30
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System
Project IDa0l8e0000012eyYAAQ
Project NumberPRO-004387
Gate1
Original textAwaiting Consents
source_record_idcsv:row:1465

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1465

Sources EV-e9d2c45a64d9199497362451
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 378bee8f3e55b1c7e6166fac3ea0b6f540e3c7c95c0b3f5d35ceb62e330eaeca

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

NatPower Allington Green Energy Park

project stage · awaiting consents

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameNatPower Allington Green Energy Park
Customer NameCOTTOM TO RYHALL ENERGY LIMITED
Connection SiteTrent Valley South Connection Node B 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease1000.00
Cumulative Total Capacity (MW)1000.00
MW Effective From2034-10-30
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System
Project IDa0l8e0000012eyYAAQ
Project NumberPRO-004387
Gate1
Original textAwaiting Consents
source_record_idcsv:row:1465

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1465

Sources EV-e9d2c45a64d9199497362451
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 378bee8f3e55b1c7e6166fac3ea0b6f540e3c7c95c0b3f5d35ceb62e330eaeca

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel