POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Berwick Bank Offshore Wind Farm A

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:0b6a268f320f7228e98aef5e · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:e3054e2d0383e64e0a72e0de
to_kindpower_object
to_idneso:connection_site:0b6a268f320f7228e98aef5e
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:169

Sources EV-fcdcb5fabaebbdd8d56c3c5c
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 3a84bbcc25f224cafc48ae7fce1dad47719311deafc1014089aced2ab6809862

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Berwick Bank Offshore Wind Farm A

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-fcdcb5fabaebbdd8d56c3c5c
MW Increase / Decrease230 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-fcdcb5fabaebbdd8d56c3c5c
Cumulative Total Capacity (MW)1380 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-fcdcb5fabaebbdd8d56c3c5c
Detailed source fields
Original source fieldPublished value or condition
Project NameBerwick Bank Offshore Wind Farm A
Customer NameBERWICK BANK A LIMITED
Connection SiteBranxton 400kV Substation
Stage2.00
MW Connected0.00
MW Increase / Decrease230.00
Cumulative Total Capacity (MW)1380.00
MW Effective From2029-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TOSPT
Plant TypeWind Offshore
Project IDa0l8e0000010wTnAAI
Project NumberPRO-002627-2
GateNot obtained
Original textScoping
source_record_idcsv:row:169

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:169

Sources EV-fcdcb5fabaebbdd8d56c3c5c
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 3a84bbcc25f224cafc48ae7fce1dad47719311deafc1014089aced2ab6809862

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Berwick Bank Offshore Wind Farm A

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBerwick Bank Offshore Wind Farm A
Customer NameBERWICK BANK A LIMITED
Connection SiteBranxton 400kV Substation
Stage2.00
MW Connected0.00
MW Increase / Decrease230.00
Cumulative Total Capacity (MW)1380.00
MW Effective From2029-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TOSPT
Plant TypeWind Offshore
Project IDa0l8e0000010wTnAAI
Project NumberPRO-002627-2
GateNot obtained
Original textScoping
source_record_idcsv:row:169

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:169

Sources EV-fcdcb5fabaebbdd8d56c3c5c
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 3a84bbcc25f224cafc48ae7fce1dad47719311deafc1014089aced2ab6809862

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel