POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Harker PV & BESS Sub

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:ce7bc83855e8d718b84db41e · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:d83fffd300813ad20bcc9610
to_kindpower_object
to_idneso:connection_site:ce7bc83855e8d718b84db41e
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:971

Sources EV-7801e399bd39b0de75434d44
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 65c50079dd95b1595e3485b08bc6a0f4edb570c88e20ca34abb2e83e504209d3

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Harker PV & BESS Sub

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-7801e399bd39b0de75434d44
MW Increase / Decrease249.9 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-7801e399bd39b0de75434d44
Cumulative Total Capacity (MW)249.9 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-7801e399bd39b0de75434d44
Detailed source fields
Original source fieldPublished value or condition
Project NameHarker PV & BESS Sub
Customer NameHARKER ENERGY PARK LIMITED
Connection SiteHarker 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease249.90
Cumulative Total Capacity (MW)249.90
MW Effective From2037-11-01
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e0000010wSpAAI
Project NumberPRO-002615
Gate1
Original textScoping
source_record_idcsv:row:971

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:971

Sources EV-7801e399bd39b0de75434d44
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 65c50079dd95b1595e3485b08bc6a0f4edb570c88e20ca34abb2e83e504209d3

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Harker PV & BESS Sub

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameHarker PV & BESS Sub
Customer NameHARKER ENERGY PARK LIMITED
Connection SiteHarker 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease249.90
Cumulative Total Capacity (MW)249.90
MW Effective From2037-11-01
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e0000010wSpAAI
Project NumberPRO-002615
Gate1
Original textScoping
source_record_idcsv:row:971

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:971

Sources EV-7801e399bd39b0de75434d44
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 65c50079dd95b1595e3485b08bc6a0f4edb570c88e20ca34abb2e83e504209d3

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel