POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

TH Stow Manor

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:9eca113735d1a031e1762f24 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:d3831be1aedea801b928fc77
to_kindpower_object
to_idneso:connection_site:9eca113735d1a031e1762f24
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1972

Sources EV-099e581077fa2fab56f4d25f
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 efc2eeba2fe28d51900ce619684ae249d7265441bf24dbbd4a53f71ee51b742a

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

TH Stow Manor

Connection register · awaiting consents

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-099e581077fa2fab56f4d25f
MW Increase / Decrease400 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-099e581077fa2fab56f4d25f
Cumulative Total Capacity (MW)400 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-099e581077fa2fab56f4d25f
Detailed source fields
Original source fieldPublished value or condition
Project NameTH Stow Manor
Customer NameFRV Powertek Limited
Connection SiteTrent Valley South Connection Node B 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease400.00
Cumulative Total Capacity (MW)400.00
MW Effective From2034-10-30
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System
Project IDa0l8e0000010xfQAAQ
Project NumberPRO-003077
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:1972

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1972

Sources EV-099e581077fa2fab56f4d25f
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 efc2eeba2fe28d51900ce619684ae249d7265441bf24dbbd4a53f71ee51b742a

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

TH Stow Manor

project stage · awaiting consents

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameTH Stow Manor
Customer NameFRV Powertek Limited
Connection SiteTrent Valley South Connection Node B 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease400.00
Cumulative Total Capacity (MW)400.00
MW Effective From2034-10-30
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System
Project IDa0l8e0000010xfQAAQ
Project NumberPRO-003077
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:1972

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1972

Sources EV-099e581077fa2fab56f4d25f
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 efc2eeba2fe28d51900ce619684ae249d7265441bf24dbbd4a53f71ee51b742a

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel