POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Glenmoy Wind Solar & BESS

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:d6d15411b0ed0e92f97758db · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:d05b9984d56e162577e5e3c4
to_kindpower_object
to_idneso:connection_site:d6d15411b0ed0e92f97758db
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:877

Sources EV-56b8350ae6f6799d9ac6330e
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 ee67a2273fc3b8a0926db4d95718d1919b249a6d94ccd2238fc3435b7df732ff

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Glenmoy Wind Solar & BESS

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-56b8350ae6f6799d9ac6330e
MW Increase / Decrease224 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-56b8350ae6f6799d9ac6330e
Cumulative Total Capacity (MW)224 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-56b8350ae6f6799d9ac6330e
Detailed source fields
Original source fieldPublished value or condition
Project NameGlenmoy Wind Solar & BESS
Customer NameGalileo 20 Limited
Connection SiteAlyth 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease224.00
Cumulative Total Capacity (MW)224.00
MW Effective From2037-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TOSHET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Project IDa0lJ9000000POtfIAG
Project NumberPRO-006134
GateNot obtained
Original textScoping
source_record_idcsv:row:877

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:877

Sources EV-56b8350ae6f6799d9ac6330e
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 ee67a2273fc3b8a0926db4d95718d1919b249a6d94ccd2238fc3435b7df732ff

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Glenmoy Wind Solar & BESS

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameGlenmoy Wind Solar & BESS
Customer NameGalileo 20 Limited
Connection SiteAlyth 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease224.00
Cumulative Total Capacity (MW)224.00
MW Effective From2037-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TOSHET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Project IDa0lJ9000000POtfIAG
Project NumberPRO-006134
GateNot obtained
Original textScoping
source_record_idcsv:row:877

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:877

Sources EV-56b8350ae6f6799d9ac6330e
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 ee67a2273fc3b8a0926db4d95718d1919b249a6d94ccd2238fc3435b7df732ff

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel