POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

West Botley High Impact Green Energy Hub

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:c21d3463c9fdc54610b8f762 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:cd41f561e88bc2f42a36137e
to_kindpower_object
to_idneso:connection_site:c21d3463c9fdc54610b8f762
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:2090

Sources EV-bfe3a6d7f2005aff485219cf
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 aa11fb35363b059c44428527ff543095d36e1a26b3e4b212cefe162281e44c5d

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

West Botley High Impact Green Energy Hub

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-bfe3a6d7f2005aff485219cf
MW Increase / Decrease100 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-bfe3a6d7f2005aff485219cf
Cumulative Total Capacity (MW)100 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-bfe3a6d7f2005aff485219cf
Detailed source fields
Original source fieldPublished value or condition
Project NameWest Botley High Impact Green Energy Hub
Customer NameTELIS ENERGY UK LIMITED
Connection SiteBotley West 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease100.00
Cumulative Total Capacity (MW)100.00
MW Effective From2037-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeDemand;Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
Project IDa0l8e0000012gbjAAA
Project NumberPRO-004435
GateNot obtained
Original textScoping
source_record_idcsv:row:2090

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:2090

Sources EV-bfe3a6d7f2005aff485219cf
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 aa11fb35363b059c44428527ff543095d36e1a26b3e4b212cefe162281e44c5d

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

West Botley High Impact Green Energy Hub

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameWest Botley High Impact Green Energy Hub
Customer NameTELIS ENERGY UK LIMITED
Connection SiteBotley West 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease100.00
Cumulative Total Capacity (MW)100.00
MW Effective From2037-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeDemand;Energy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
Project IDa0l8e0000012gbjAAA
Project NumberPRO-004435
GateNot obtained
Original textScoping
source_record_idcsv:row:2090

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:2090

Sources EV-bfe3a6d7f2005aff485219cf
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 aa11fb35363b059c44428527ff543095d36e1a26b3e4b212cefe162281e44c5d

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel