POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

ER BRF 2 Energy

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:da41a5b95c5c487ad13c3733 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:c652478a7f019b2b66b072b6
to_kindpower_object
to_idneso:connection_site:da41a5b95c5c487ad13c3733
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:722

Sources EV-531dd7a8766335f55268ba51
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 a0de9b97e341458238891b4c031a03415c7e0b26223ab64d0c8c8d03ba918de2

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

ER BRF 2 Energy

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-531dd7a8766335f55268ba51
MW Increase / Decrease249 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-531dd7a8766335f55268ba51
Cumulative Total Capacity (MW)249 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-531dd7a8766335f55268ba51
Detailed source fields
Original source fieldPublished value or condition
Project NameER BRF 2 Energy
Customer NameER PROJECT DEVELOPMENT CO LIMITED
Connection SiteBramford 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease249.00
Cumulative Total Capacity (MW)249.00
MW Effective From2033-07-30
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e000000exSYAAY
Project NumberPRO-003725
Gate1
Original textScoping
source_record_idcsv:row:722

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:722

Sources EV-531dd7a8766335f55268ba51
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 a0de9b97e341458238891b4c031a03415c7e0b26223ab64d0c8c8d03ba918de2

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

ER BRF 2 Energy

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameER BRF 2 Energy
Customer NameER PROJECT DEVELOPMENT CO LIMITED
Connection SiteBramford 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease249.00
Cumulative Total Capacity (MW)249.00
MW Effective From2033-07-30
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e000000exSYAAY
Project NumberPRO-003725
Gate1
Original textScoping
source_record_idcsv:row:722

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:722

Sources EV-531dd7a8766335f55268ba51
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 a0de9b97e341458238891b4c031a03415c7e0b26223ab64d0c8c8d03ba918de2

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel