POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Balbougie Energy Centre

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:d5244f7e2b94fcd1ce50f554 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:c4c129eba0677d9c366340ff
to_kindpower_object
to_idneso:connection_site:d5244f7e2b94fcd1ce50f554
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:110

Sources EV-0c6e14564c184491a189ad25
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 0cee26aa257ef52c3dddbb108d1235d4b5bb5f054a9acbd3f62e12ac115b7549

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Balbougie Energy Centre

Connection register · consented

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-0c6e14564c184491a189ad25
MW Increase / Decrease42 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-0c6e14564c184491a189ad25
Cumulative Total Capacity (MW)42 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-0c6e14564c184491a189ad25
Detailed source fields
Original source fieldPublished value or condition
Project NameBalbougie Energy Centre
Customer NameBalbougie Energy Centre II Limited
Connection SiteInverkeithing 132/33kV
StageNot obtained
MW Connected0.00
MW Increase / Decrease42.00
Cumulative Total Capacity (MW)42.00
MW Effective From2026-07-31
Project StatusConsents Approved
Agreement TypeEmbedded
HOST TOSPT
Plant TypeEnergy Storage System
Project IDa0l4L0000005iTpQAI
Project NumberPRO-002065
Gate2
Original textConsents Approved
source_record_idcsv:row:110

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:110

Sources EV-0c6e14564c184491a189ad25
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 0cee26aa257ef52c3dddbb108d1235d4b5bb5f054a9acbd3f62e12ac115b7549

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Balbougie Energy Centre

project stage · consented

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBalbougie Energy Centre
Customer NameBalbougie Energy Centre II Limited
Connection SiteInverkeithing 132/33kV
StageNot obtained
MW Connected0.00
MW Increase / Decrease42.00
Cumulative Total Capacity (MW)42.00
MW Effective From2026-07-31
Project StatusConsents Approved
Agreement TypeEmbedded
HOST TOSPT
Plant TypeEnergy Storage System
Project IDa0l4L0000005iTpQAI
Project NumberPRO-002065
Gate2
Original textConsents Approved
source_record_idcsv:row:110

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:110

Sources EV-0c6e14564c184491a189ad25
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 0cee26aa257ef52c3dddbb108d1235d4b5bb5f054a9acbd3f62e12ac115b7549

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel