Bramley BESS

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:156fd295772c723dd875a3af · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:b8d283e3fde947dbc882f78c
to_kindpower_object
to_idneso:connection_site:156fd295772c723dd875a3af
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:260

Sources EV-fa380ced5b312d43b2c059b5
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 0454c0e1aab1ef659148aa2d05a4bceb9713a151cf6c99cf7e97f235dcfcda5e

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Bramley BESS

Connection register · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-fa380ced5b312d43b2c059b5
MW Increase / Decrease50 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-fa380ced5b312d43b2c059b5
Cumulative Total Capacity (MW)50 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-fa380ced5b312d43b2c059b5
Detailed source fields
Original source fieldPublished value or condition
Project NameBramley BESS
Customer NameBRAMLEY BESS LIMITED
Connection SiteBramley 400kV Substation
Stage1.00
MW Connected0.00
MW Increase / Decrease50.00
Cumulative Total Capacity (MW)50.00
MW Effective From2027-10-30
Project StatusUnder Construction/Commissioning
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System
Project IDa0l4L0000005igrQAA
Project NumberPRO-001104-1
Gate2
Original textUnder Construction/Commissioning
source_record_idcsv:row:260

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:260

Sources EV-fa380ced5b312d43b2c059b5
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 0454c0e1aab1ef659148aa2d05a4bceb9713a151cf6c99cf7e97f235dcfcda5e

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Bramley BESS

project stage · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBramley BESS
Customer NameBRAMLEY BESS LIMITED
Connection SiteBramley 400kV Substation
Stage1.00
MW Connected0.00
MW Increase / Decrease50.00
Cumulative Total Capacity (MW)50.00
MW Effective From2027-10-30
Project StatusUnder Construction/Commissioning
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System
Project IDa0l4L0000005igrQAA
Project NumberPRO-001104-1
Gate2
Original textUnder Construction/Commissioning
source_record_idcsv:row:260

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:260

Sources EV-fa380ced5b312d43b2c059b5
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 0454c0e1aab1ef659148aa2d05a4bceb9713a151cf6c99cf7e97f235dcfcda5e

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel