POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Bicker Fenn Energy Park

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:3c4bc335b73b779d895b1a4f · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:b5ba0c2048aa5905c350cb5d
to_kindpower_object
to_idneso:connection_site:3c4bc335b73b779d895b1a4f
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:190

Sources EV-362d39cb210de82e8db9ee68
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 36add2ef47d52a50ec90409a51530be96ea7332f30cf29c5033513124475c7f8

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Bicker Fenn Energy Park

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-362d39cb210de82e8db9ee68
MW Increase / Decrease600 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-362d39cb210de82e8db9ee68
Cumulative Total Capacity (MW)600 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-362d39cb210de82e8db9ee68
Detailed source fields
Original source fieldPublished value or condition
Project NameBicker Fenn Energy Park
Customer NameBEACON FEN ENERGY PARK LIMITED
Connection SiteBicker Fen 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease600.00
Cumulative Total Capacity (MW)600.00
MW Effective From2029-06-01
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l4L0000005iZPQAY
Project NumberPRO-001984
GateNot obtained
Original textScoping
source_record_idcsv:row:190

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:190

Sources EV-362d39cb210de82e8db9ee68
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 36add2ef47d52a50ec90409a51530be96ea7332f30cf29c5033513124475c7f8

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Bicker Fenn Energy Park

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBicker Fenn Energy Park
Customer NameBEACON FEN ENERGY PARK LIMITED
Connection SiteBicker Fen 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease600.00
Cumulative Total Capacity (MW)600.00
MW Effective From2029-06-01
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l4L0000005iZPQAY
Project NumberPRO-001984
GateNot obtained
Original textScoping
source_record_idcsv:row:190

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:190

Sources EV-362d39cb210de82e8db9ee68
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 36add2ef47d52a50ec90409a51530be96ea7332f30cf29c5033513124475c7f8

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel