POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Airtnoch BESS

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:63bb633b5b6c056f3baa2a1a · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:b497abc2cfd116c3d9a5b650
to_kindpower_object
to_idneso:connection_site:63bb633b5b6c056f3baa2a1a
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:39

Sources EV-e89ae488c27ee334ea4eae46
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 e56fc85f1d24372d2466dc1be62e821f4ea4cf9fc6dc3e3449dc920eb34707ee

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Airtnoch BESS

Connection register · awaiting consents

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-e89ae488c27ee334ea4eae46
MW Increase / Decrease89 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-e89ae488c27ee334ea4eae46
Cumulative Total Capacity (MW)89 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-e89ae488c27ee334ea4eae46
Detailed source fields
Original source fieldPublished value or condition
Project NameAirtnoch BESS
Customer NameTURBINE MARKETING SPV LIMITED
Connection SiteWhitelee Extension 275/33kV
StageNot obtained
MW Connected0.00
MW Increase / Decrease89.00
Cumulative Total Capacity (MW)89.00
MW Effective From2027-09-29
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TOSPT
Plant TypeEnergy Storage System
Project IDa0l8e000000eygIAAQ
Project NumberPRO-003769
Gate1
Original textAwaiting Consents
source_record_idcsv:row:39

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:39

Sources EV-e89ae488c27ee334ea4eae46
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 e56fc85f1d24372d2466dc1be62e821f4ea4cf9fc6dc3e3449dc920eb34707ee

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Airtnoch BESS

project stage · awaiting consents

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameAirtnoch BESS
Customer NameTURBINE MARKETING SPV LIMITED
Connection SiteWhitelee Extension 275/33kV
StageNot obtained
MW Connected0.00
MW Increase / Decrease89.00
Cumulative Total Capacity (MW)89.00
MW Effective From2027-09-29
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TOSPT
Plant TypeEnergy Storage System
Project IDa0l8e000000eygIAAQ
Project NumberPRO-003769
Gate1
Original textAwaiting Consents
source_record_idcsv:row:39

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:39

Sources EV-e89ae488c27ee334ea4eae46
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 e56fc85f1d24372d2466dc1be62e821f4ea4cf9fc6dc3e3449dc920eb34707ee

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel