POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Holmston Farm Battery Energy Storage System

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:32a67ff4d504b785c2e1ea2a · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:aa8fb8fad759eac2e95a6f2d
to_kindpower_object
to_idneso:connection_site:32a67ff4d504b785c2e1ea2a
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1024

Sources EV-f778c104f142d9a4bd0a2af2
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 1635fa843a69b7188001090b508df63d3d06ebe8b345c72fd2584f12d1fe4087

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Holmston Farm Battery Energy Storage System

Connection register · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-f778c104f142d9a4bd0a2af2
MW Increase / Decrease49.9 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-f778c104f142d9a4bd0a2af2
Cumulative Total Capacity (MW)49.9 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-f778c104f142d9a4bd0a2af2
Detailed source fields
Original source fieldPublished value or condition
Project NameHolmston Farm Battery Energy Storage System
Customer NameField Holmston Ltd
Connection SiteAyr 275/33kV
StageNot obtained
MW Connected0.00
MW Increase / Decrease49.90
Cumulative Total Capacity (MW)49.90
MW Effective From2026-07-31
Project StatusUnder Construction/Commissioning
Agreement TypeEmbedded
HOST TOSPT
Plant TypeEnergy Storage System
Project IDa0l4L0000005iXiQAI
Project NumberPRO-002359
Gate2
Original textUnder Construction/Commissioning
source_record_idcsv:row:1024

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1024

Sources EV-f778c104f142d9a4bd0a2af2
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 1635fa843a69b7188001090b508df63d3d06ebe8b345c72fd2584f12d1fe4087

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Holmston Farm Battery Energy Storage System

project stage · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameHolmston Farm Battery Energy Storage System
Customer NameField Holmston Ltd
Connection SiteAyr 275/33kV
StageNot obtained
MW Connected0.00
MW Increase / Decrease49.90
Cumulative Total Capacity (MW)49.90
MW Effective From2026-07-31
Project StatusUnder Construction/Commissioning
Agreement TypeEmbedded
HOST TOSPT
Plant TypeEnergy Storage System
Project IDa0l4L0000005iXiQAI
Project NumberPRO-002359
Gate2
Original textUnder Construction/Commissioning
source_record_idcsv:row:1024

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1024

Sources EV-f778c104f142d9a4bd0a2af2
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 1635fa843a69b7188001090b508df63d3d06ebe8b345c72fd2584f12d1fe4087

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel