POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Whitelee Extension

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:63bb633b5b6c056f3baa2a1a · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:9f71da995246c980525bc32d
to_kindpower_object
to_idneso:connection_site:63bb633b5b6c056f3baa2a1a
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:2125

Sources EV-997a15f309a7d6a680cbaa60
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 195e72fd2e68847de0952d8083c8c8763496c5f453b662f487e994843bdaa29c

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Whitelee Extension

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected206 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-997a15f309a7d6a680cbaa60
MW Increase / Decrease32 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-997a15f309a7d6a680cbaa60
Cumulative Total Capacity (MW)238 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-997a15f309a7d6a680cbaa60
Detailed source fields
Original source fieldPublished value or condition
Project NameWhitelee Extension
Customer NameSCOTTISHPOWER RENEWABLES (UK) LIMITED
Connection SiteWhitelee Extension 275/33kV
StageNot obtained
MW Connected206.00
MW Increase / Decrease32.00
Cumulative Total Capacity (MW)238.00
MW Effective From2026-12-01
Project StatusBuilt
Agreement TypeDirect Connection
HOST TOSPT
Plant TypeEnergy Storage System;Hydrogen;PV Array (Photo Voltaic/solar);Wind Onshore
Project IDa0l4L0000005imfQAA
Project NumberPRO-000068
GateNot obtained
Original textBuilt
source_record_idcsv:row:2125

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:2125

Sources EV-997a15f309a7d6a680cbaa60
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 195e72fd2e68847de0952d8083c8c8763496c5f453b662f487e994843bdaa29c

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Whitelee Extension

project stage · built

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameWhitelee Extension
Customer NameSCOTTISHPOWER RENEWABLES (UK) LIMITED
Connection SiteWhitelee Extension 275/33kV
StageNot obtained
MW Connected206.00
MW Increase / Decrease32.00
Cumulative Total Capacity (MW)238.00
MW Effective From2026-12-01
Project StatusBuilt
Agreement TypeDirect Connection
HOST TOSPT
Plant TypeEnergy Storage System;Hydrogen;PV Array (Photo Voltaic/solar);Wind Onshore
Project IDa0l4L0000005imfQAA
Project NumberPRO-000068
GateNot obtained
Original textBuilt
source_record_idcsv:row:2125

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:2125

Sources EV-997a15f309a7d6a680cbaa60
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 195e72fd2e68847de0952d8083c8c8763496c5f453b662f487e994843bdaa29c

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel