POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Grantham Solar Farm - RSL

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:4eade8ba3d95a4076927d67e · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:9ef6c466dbacaa90011b5af8
to_kindpower_object
to_idneso:connection_site:4eade8ba3d95a4076927d67e
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:899

Sources EV-a8a6c9f606755c7c584e36f8
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 ef2f9bcf3883c9fcb2dd2496d5fe230f9176ef50ce3f8ac26842fcb915358270

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Grantham Solar Farm - RSL

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-a8a6c9f606755c7c584e36f8
MW Increase / Decrease810 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-a8a6c9f606755c7c584e36f8
Cumulative Total Capacity (MW)810 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-a8a6c9f606755c7c584e36f8
Detailed source fields
Original source fieldPublished value or condition
Project NameGrantham Solar Farm - RSL
Customer NameSOUTH GRANTHAM ENERGY CENTRE LIMITED
Connection SiteTrent Valley South Connection Node C 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease810.00
Cumulative Total Capacity (MW)810.00
MW Effective From2034-10-30
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0lJ9000000PDt9IAG
Project NumberPRO-005045
Gate1
Original textScoping
source_record_idcsv:row:899

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:899

Sources EV-a8a6c9f606755c7c584e36f8
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 ef2f9bcf3883c9fcb2dd2496d5fe230f9176ef50ce3f8ac26842fcb915358270

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Grantham Solar Farm - RSL

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameGrantham Solar Farm - RSL
Customer NameSOUTH GRANTHAM ENERGY CENTRE LIMITED
Connection SiteTrent Valley South Connection Node C 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease810.00
Cumulative Total Capacity (MW)810.00
MW Effective From2034-10-30
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0lJ9000000PDt9IAG
Project NumberPRO-005045
Gate1
Original textScoping
source_record_idcsv:row:899

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:899

Sources EV-a8a6c9f606755c7c584e36f8
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 ef2f9bcf3883c9fcb2dd2496d5fe230f9176ef50ce3f8ac26842fcb915358270

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel