POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Bramley (tertiary)

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:156fd295772c723dd875a3af · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:97e6ff4b1932b09628ab68c6
to_kindpower_object
to_idneso:connection_site:156fd295772c723dd875a3af
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:259

Sources EV-b96447f93dfcbe44d282f7ec
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 4a7f087efa2a1f944126340417dac317432809c5fa0a929fe3f80e7a19dc753b

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Bramley (tertiary)

Connection register · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-b96447f93dfcbe44d282f7ec
MW Increase / Decrease57 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-b96447f93dfcbe44d282f7ec
Cumulative Total Capacity (MW)57 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-b96447f93dfcbe44d282f7ec
Detailed source fields
Original source fieldPublished value or condition
Project NameBramley (tertiary)
Customer NameBRAMLEY SOLAR LIMITED
Connection SiteBramley 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease57.00
Cumulative Total Capacity (MW)57.00
MW Effective From2027-10-30
Project StatusUnder Construction/Commissioning
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l4L0000005ilOQAQ
Project NumberPRO-000396
Gate2
Original textUnder Construction/Commissioning
source_record_idcsv:row:259

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:259

Sources EV-b96447f93dfcbe44d282f7ec
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 4a7f087efa2a1f944126340417dac317432809c5fa0a929fe3f80e7a19dc753b

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Bramley (tertiary)

project stage · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBramley (tertiary)
Customer NameBRAMLEY SOLAR LIMITED
Connection SiteBramley 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease57.00
Cumulative Total Capacity (MW)57.00
MW Effective From2027-10-30
Project StatusUnder Construction/Commissioning
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l4L0000005ilOQAQ
Project NumberPRO-000396
Gate2
Original textUnder Construction/Commissioning
source_record_idcsv:row:259

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:259

Sources EV-b96447f93dfcbe44d282f7ec
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 4a7f087efa2a1f944126340417dac317432809c5fa0a929fe3f80e7a19dc753b

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel