Bramford GEC (Ethos Green)

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:5d7666f02802ad084c575fe6 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:937e722f6464c16a9faa30af
to_kindpower_object
to_idneso:connection_site:5d7666f02802ad084c575fe6
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:256

Sources EV-b0b5884fc65a7939cda82a09
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 694ce241c978261c812c79d51abfc1c89cf9575abf12894ee11507f0819d75be

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Bramford GEC (Ethos Green)

Connection register · awaiting consents

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-b0b5884fc65a7939cda82a09
MW Increase / Decrease650 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-b0b5884fc65a7939cda82a09
Cumulative Total Capacity (MW)650 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-b0b5884fc65a7939cda82a09
Detailed source fields
Original source fieldPublished value or condition
Project NameBramford GEC (Ethos Green)
Customer NameBRAMFORD GREEN ENERGY CENTRE LTD
Connection SiteBramford B 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease650.00
Cumulative Total Capacity (MW)650.00
MW Effective From2033-10-30
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e000000f8NgAAI
Project NumberPRO-004027
Gate1
Original textAwaiting Consents
source_record_idcsv:row:256

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:256

Sources EV-b0b5884fc65a7939cda82a09
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 694ce241c978261c812c79d51abfc1c89cf9575abf12894ee11507f0819d75be

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Bramford GEC (Ethos Green)

project stage · awaiting consents

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBramford GEC (Ethos Green)
Customer NameBRAMFORD GREEN ENERGY CENTRE LTD
Connection SiteBramford B 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease650.00
Cumulative Total Capacity (MW)650.00
MW Effective From2033-10-30
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e000000f8NgAAI
Project NumberPRO-004027
Gate1
Original textAwaiting Consents
source_record_idcsv:row:256

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:256

Sources EV-b0b5884fc65a7939cda82a09
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 694ce241c978261c812c79d51abfc1c89cf9575abf12894ee11507f0819d75be

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel