POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Swansea Greener Grid Park - Connection 1

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:cc69df278756039708d7549b · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:8c030fabafd5d45354c53fda
to_kindpower_object
to_idneso:connection_site:cc69df278756039708d7549b
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1938

Sources EV-2ee6646739f33022d7094ff3
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 ef9390e6dc3274fd9fcca0f8fb433cb11827bce1fa2f64762b926282cf55e1b8

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Swansea Greener Grid Park - Connection 1

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-2ee6646739f33022d7094ff3
MW Increase / Decrease85 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-2ee6646739f33022d7094ff3
Cumulative Total Capacity (MW)97 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-2ee6646739f33022d7094ff3
Detailed source fields
Original source fieldPublished value or condition
Project NameSwansea Greener Grid Park - Connection 1
Customer NameSWANSEA GRID SOLUTIONS LIMITED
Connection SiteSwansea North 400kV Substation
Stage2.00
MW Connected0.00
MW Increase / Decrease85.00
Cumulative Total Capacity (MW)97.00
MW Effective From2028-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;Reactive Compensation
Project IDa0l4L0000005ifaQAA
Project NumberPRO-001120-2
GateNot obtained
Original textScoping
source_record_idcsv:row:1938

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1938

Sources EV-2ee6646739f33022d7094ff3
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 ef9390e6dc3274fd9fcca0f8fb433cb11827bce1fa2f64762b926282cf55e1b8

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Swansea Greener Grid Park - Connection 1

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameSwansea Greener Grid Park - Connection 1
Customer NameSWANSEA GRID SOLUTIONS LIMITED
Connection SiteSwansea North 400kV Substation
Stage2.00
MW Connected0.00
MW Increase / Decrease85.00
Cumulative Total Capacity (MW)97.00
MW Effective From2028-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;Reactive Compensation
Project IDa0l4L0000005ifaQAA
Project NumberPRO-001120-2
GateNot obtained
Original textScoping
source_record_idcsv:row:1938

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1938

Sources EV-2ee6646739f33022d7094ff3
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 ef9390e6dc3274fd9fcca0f8fb433cb11827bce1fa2f64762b926282cf55e1b8

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel