POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Cliff Hill Energy Farm

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:2decd0819801dfbe7fc91adb · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:88646f1d4fb0f931f4462350
to_kindpower_object
to_idneso:connection_site:2decd0819801dfbe7fc91adb
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:419

Sources EV-b970ff59c679758715366bcd
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 92f1c8e8d6d1144164cb97c2294b2d3cf940cfcbb730e02ce63792f09d529deb

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Cliff Hill Energy Farm

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-b970ff59c679758715366bcd
MW Increase / Decrease800 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-b970ff59c679758715366bcd
Cumulative Total Capacity (MW)800 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-b970ff59c679758715366bcd
Detailed source fields
Original source fieldPublished value or condition
Project NameCliff Hill Energy Farm
Customer NameCairn Duhie Energy Limited
Connection SiteNavenby 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease800.00
Cumulative Total Capacity (MW)800.00
MW Effective From2034-10-30
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e000000f4xRAAQ
Project NumberPRO-003896
Gate1
Original textScoping
source_record_idcsv:row:419

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:419

Sources EV-b970ff59c679758715366bcd
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 92f1c8e8d6d1144164cb97c2294b2d3cf940cfcbb730e02ce63792f09d529deb

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Cliff Hill Energy Farm

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameCliff Hill Energy Farm
Customer NameCairn Duhie Energy Limited
Connection SiteNavenby 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease800.00
Cumulative Total Capacity (MW)800.00
MW Effective From2034-10-30
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e000000f4xRAAQ
Project NumberPRO-003896
Gate1
Original textScoping
source_record_idcsv:row:419

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:419

Sources EV-b970ff59c679758715366bcd
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 92f1c8e8d6d1144164cb97c2294b2d3cf940cfcbb730e02ce63792f09d529deb

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel