POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Braintree (Tertiary)

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:e5561a982a7ec44859643e27 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:75b907ddeed1a1c9d0b6df99
to_kindpower_object
to_idneso:connection_site:e5561a982a7ec44859643e27
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:252

Sources EV-566e7c377fd66ae2525d0feb
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 36d645bc18018e66b3e580b0c33050ce4e91c4aec530008123c531155607838a

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Braintree (Tertiary)

Connection register · consented

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-566e7c377fd66ae2525d0feb
MW Increase / Decrease49.9 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-566e7c377fd66ae2525d0feb
Cumulative Total Capacity (MW)49.9 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-566e7c377fd66ae2525d0feb
Detailed source fields
Original source fieldPublished value or condition
Project NameBraintree (Tertiary)
Customer NameCSE22 LIMITED
Connection SiteBraintree 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease49.90
Cumulative Total Capacity (MW)49.90
MW Effective From2026-10-30
Project StatusConsents Approved
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l4L0000005iZeQAI
Project NumberPRO-001043
GateNot obtained
Original textConsents Approved
source_record_idcsv:row:252

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:252

Sources EV-566e7c377fd66ae2525d0feb
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 36d645bc18018e66b3e580b0c33050ce4e91c4aec530008123c531155607838a

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Braintree (Tertiary)

project stage · consented

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBraintree (Tertiary)
Customer NameCSE22 LIMITED
Connection SiteBraintree 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease49.90
Cumulative Total Capacity (MW)49.90
MW Effective From2026-10-30
Project StatusConsents Approved
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l4L0000005iZeQAI
Project NumberPRO-001043
GateNot obtained
Original textConsents Approved
source_record_idcsv:row:252

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:252

Sources EV-566e7c377fd66ae2525d0feb
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 36d645bc18018e66b3e580b0c33050ce4e91c4aec530008123c531155607838a

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel