This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Crakaig Wind Energy Hub

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:c2a5fc98bfbf8c24b3bf6606 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:704a4875365e170ef1010c86
to_kindpower_object
to_idneso:connection_site:c2a5fc98bfbf8c24b3bf6606
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:506

Sources EV-8122f66ce44147fde6ed0bc7
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 370b6bc50a6dd56124cb5e9a70c401e69936a33a2aa5fdb6501038d32eaabe5d

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Crakaig Wind Energy Hub

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-8122f66ce44147fde6ed0bc7
MW Increase / Decrease60 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-8122f66ce44147fde6ed0bc7
Cumulative Total Capacity (MW)60 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-8122f66ce44147fde6ed0bc7
Detailed source fields
Original source fieldPublished value or condition
Project NameCrakaig Wind Energy Hub
Customer NameCRAKAIG WIND ENERGY HUB LIMITED
Connection SiteBRORA 132/33KV GRID SUPPLY POINT SUBSTATION
StageNot obtained
MW Connected0.00
MW Increase / Decrease60.00
Cumulative Total Capacity (MW)60.00
MW Effective From2034-10-31
Project StatusScoping
Agreement TypeEmbedded
HOST TOSHET
Plant TypeEnergy Storage System;Wind Onshore
Project IDa0l8e000000exYDAAY
Project NumberPRO-003734
Gate1
Original textScoping
source_record_idcsv:row:506

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:506

Sources EV-8122f66ce44147fde6ed0bc7
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 370b6bc50a6dd56124cb5e9a70c401e69936a33a2aa5fdb6501038d32eaabe5d

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Crakaig Wind Energy Hub

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameCrakaig Wind Energy Hub
Customer NameCRAKAIG WIND ENERGY HUB LIMITED
Connection SiteBRORA 132/33KV GRID SUPPLY POINT SUBSTATION
StageNot obtained
MW Connected0.00
MW Increase / Decrease60.00
Cumulative Total Capacity (MW)60.00
MW Effective From2034-10-31
Project StatusScoping
Agreement TypeEmbedded
HOST TOSHET
Plant TypeEnergy Storage System;Wind Onshore
Project IDa0l8e000000exYDAAY
Project NumberPRO-003734
Gate1
Original textScoping
source_record_idcsv:row:506

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:506

Sources EV-8122f66ce44147fde6ed0bc7
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 370b6bc50a6dd56124cb5e9a70c401e69936a33a2aa5fdb6501038d32eaabe5d

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel