POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Clashindarroch 2

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:b96f5b9207b3e779123257dd · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:655016c4f566f0ecb43aea88
to_kindpower_object
to_idneso:connection_site:b96f5b9207b3e779123257dd
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:409

Sources EV-6b31eb5514173eddfb61900f
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 358b587f180813b9cb0e92740a1fcde4ef4e0534d38f76964a4a244d66d36882

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Clashindarroch 2

Connection register · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-6b31eb5514173eddfb61900f
MW Increase / Decrease63 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-6b31eb5514173eddfb61900f
Cumulative Total Capacity (MW)63 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-6b31eb5514173eddfb61900f
Detailed source fields
Original source fieldPublished value or condition
Project NameClashindarroch 2
Customer NameVATTENFALL WIND POWER LTD
Connection SiteCairnford GSP
StageNot obtained
MW Connected0.00
MW Increase / Decrease63.00
Cumulative Total Capacity (MW)63.00
MW Effective From2027-06-04
Project StatusUnder Construction/Commissioning
Agreement TypeEmbedded
HOST TOSHET
Plant TypeWind Onshore
Project IDa0l4L0000005iV1QAI
Project NumberPRO-000041
Gate2
Original textUnder Construction/Commissioning
source_record_idcsv:row:409

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:409

Sources EV-6b31eb5514173eddfb61900f
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 358b587f180813b9cb0e92740a1fcde4ef4e0534d38f76964a4a244d66d36882

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Clashindarroch 2

project stage · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameClashindarroch 2
Customer NameVATTENFALL WIND POWER LTD
Connection SiteCairnford GSP
StageNot obtained
MW Connected0.00
MW Increase / Decrease63.00
Cumulative Total Capacity (MW)63.00
MW Effective From2027-06-04
Project StatusUnder Construction/Commissioning
Agreement TypeEmbedded
HOST TOSHET
Plant TypeWind Onshore
Project IDa0l4L0000005iV1QAI
Project NumberPRO-000041
Gate2
Original textUnder Construction/Commissioning
source_record_idcsv:row:409

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:409

Sources EV-6b31eb5514173eddfb61900f
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 358b587f180813b9cb0e92740a1fcde4ef4e0534d38f76964a4a244d66d36882

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel