POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Cranwell Solar & BESS Farm

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:4eade8ba3d95a4076927d67e · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:5ea70690e3e2ffd846aba514
to_kindpower_object
to_idneso:connection_site:4eade8ba3d95a4076927d67e
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:507

Sources EV-daa545164abfb0478a2ca83c
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 eff017e38f486e3f1b8b0e51b0c2562a9f4b942cfaa2cbba0164a343cc801b49

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Cranwell Solar & BESS Farm

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-daa545164abfb0478a2ca83c
MW Increase / Decrease300 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-daa545164abfb0478a2ca83c
Cumulative Total Capacity (MW)300 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-daa545164abfb0478a2ca83c
Detailed source fields
Original source fieldPublished value or condition
Project NameCranwell Solar & BESS Farm
Customer NameTRIO POWER LIMITED
Connection SiteTrent Valley South Connection Node C 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease300.00
Cumulative Total Capacity (MW)300.00
MW Effective From2034-10-30
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0lJ9000000blnVIAQ
Project NumberPRO-004952
GateNot obtained
Original textScoping
source_record_idcsv:row:507

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:507

Sources EV-daa545164abfb0478a2ca83c
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 eff017e38f486e3f1b8b0e51b0c2562a9f4b942cfaa2cbba0164a343cc801b49

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Cranwell Solar & BESS Farm

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameCranwell Solar & BESS Farm
Customer NameTRIO POWER LIMITED
Connection SiteTrent Valley South Connection Node C 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease300.00
Cumulative Total Capacity (MW)300.00
MW Effective From2034-10-30
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0lJ9000000blnVIAQ
Project NumberPRO-004952
GateNot obtained
Original textScoping
source_record_idcsv:row:507

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:507

Sources EV-daa545164abfb0478a2ca83c
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 eff017e38f486e3f1b8b0e51b0c2562a9f4b942cfaa2cbba0164a343cc801b49

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel