POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Zenobe Blackhillock 300 MW

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:c449ea3732b4bf775e7974f8 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:5c5c4d22fd592b84116de5a0
to_kindpower_object
to_idneso:connection_site:c449ea3732b4bf775e7974f8
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:2185

Sources EV-ac81a90ba2eee38b3ad696b7
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 eaf589d9e2344b7081c6e9cc52bd695fc01b54e7fe193fd3dc2075020f0dbd5b

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Zenobe Blackhillock 300 MW

Connection register · consented

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-ac81a90ba2eee38b3ad696b7
MW Increase / Decrease100 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-ac81a90ba2eee38b3ad696b7
Cumulative Total Capacity (MW)300 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-ac81a90ba2eee38b3ad696b7
Detailed source fields
Original source fieldPublished value or condition
Project NameZenobe Blackhillock 300 MW
Customer NameZENOBE BLACKHILLOCK LIMITED
Connection SiteBlackhillock 275kV Substation
Stage2.00
MW Connected0.00
MW Increase / Decrease100.00
Cumulative Total Capacity (MW)300.00
MW Effective From2026-04-01
Project StatusConsents Approved
Agreement TypeDirect Connection
HOST TOSHET
Plant TypeEnergy Storage System
Project IDa0l4L0000005iNTQAY
Project NumberPRO-001624-2
GateNot obtained
Original textConsents Approved
source_record_idcsv:row:2185

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:2185

Sources EV-ac81a90ba2eee38b3ad696b7
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 eaf589d9e2344b7081c6e9cc52bd695fc01b54e7fe193fd3dc2075020f0dbd5b

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Zenobe Blackhillock 300 MW

project stage · consented

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameZenobe Blackhillock 300 MW
Customer NameZENOBE BLACKHILLOCK LIMITED
Connection SiteBlackhillock 275kV Substation
Stage2.00
MW Connected0.00
MW Increase / Decrease100.00
Cumulative Total Capacity (MW)300.00
MW Effective From2026-04-01
Project StatusConsents Approved
Agreement TypeDirect Connection
HOST TOSHET
Plant TypeEnergy Storage System
Project IDa0l4L0000005iNTQAY
Project NumberPRO-001624-2
GateNot obtained
Original textConsents Approved
source_record_idcsv:row:2185

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:2185

Sources EV-ac81a90ba2eee38b3ad696b7
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 eaf589d9e2344b7081c6e9cc52bd695fc01b54e7fe193fd3dc2075020f0dbd5b

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel