POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Stretchford Farm Solar and Storage

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:4a7b1b9b8f95b5548e7cd09d · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:5b4df8c2d7a2914f9e66a376
to_kindpower_object
to_idneso:connection_site:4a7b1b9b8f95b5548e7cd09d
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1919

Sources EV-6ab12caa6391011dd3d4bff2
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 236b14c587008a4c816440e4577b856436ccb8d662d4988331f486e0438e5e62

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Stretchford Farm Solar and Storage

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-6ab12caa6391011dd3d4bff2
MW Increase / Decrease100 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-6ab12caa6391011dd3d4bff2
Cumulative Total Capacity (MW)100 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-6ab12caa6391011dd3d4bff2
Detailed source fields
Original source fieldPublished value or condition
Project NameStretchford Farm Solar and Storage
Customer NameBSR APPLICATIONS LIMITED
Connection SiteAbham 132kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease100.00
Cumulative Total Capacity (MW)100.00
MW Effective From2037-10-30
Project StatusScoping
Agreement TypeEmbedded
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e0000012hoFAAQ
Project NumberPRO-004522
GateNot obtained
Original textScoping
source_record_idcsv:row:1919

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1919

Sources EV-6ab12caa6391011dd3d4bff2
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 236b14c587008a4c816440e4577b856436ccb8d662d4988331f486e0438e5e62

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Stretchford Farm Solar and Storage

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameStretchford Farm Solar and Storage
Customer NameBSR APPLICATIONS LIMITED
Connection SiteAbham 132kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease100.00
Cumulative Total Capacity (MW)100.00
MW Effective From2037-10-30
Project StatusScoping
Agreement TypeEmbedded
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e0000012hoFAAQ
Project NumberPRO-004522
GateNot obtained
Original textScoping
source_record_idcsv:row:1919

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1919

Sources EV-6ab12caa6391011dd3d4bff2
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 236b14c587008a4c816440e4577b856436ccb8d662d4988331f486e0438e5e62

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel