POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Spalding High Impact Energy Hub

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:166457d5cd28610d3212f2a3 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:58319d239a35f2e6771ac49b
to_kindpower_object
to_idneso:connection_site:166457d5cd28610d3212f2a3
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1858

Sources EV-e700b1b2d39a5b6cf39e474f
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 eea196e79e4a398e41945637a6bfaca0e7455726525fc4779df5f5e526b7415d

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Spalding High Impact Energy Hub

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-e700b1b2d39a5b6cf39e474f
MW Increase / Decrease1000 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-e700b1b2d39a5b6cf39e474f
Cumulative Total Capacity (MW)1000 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-e700b1b2d39a5b6cf39e474f
Detailed source fields
Original source fieldPublished value or condition
Project NameSpalding High Impact Energy Hub
Customer NameTELIS ENERGY UK LIMITED
Connection SiteWest Anglia Connection Node G 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease1000.00
Cumulative Total Capacity (MW)1000.00
MW Effective From2034-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
Project IDa0l8e0000012hnqAAA
Project NumberPRO-004517
Gate1
Original textScoping
source_record_idcsv:row:1858

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1858

Sources EV-e700b1b2d39a5b6cf39e474f
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 eea196e79e4a398e41945637a6bfaca0e7455726525fc4779df5f5e526b7415d

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Spalding High Impact Energy Hub

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameSpalding High Impact Energy Hub
Customer NameTELIS ENERGY UK LIMITED
Connection SiteWest Anglia Connection Node G 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease1000.00
Cumulative Total Capacity (MW)1000.00
MW Effective From2034-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;Nuclear;PV Array (Photo Voltaic/solar);Wind Onshore
Project IDa0l8e0000012hnqAAA
Project NumberPRO-004517
Gate1
Original textScoping
source_record_idcsv:row:1858

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1858

Sources EV-e700b1b2d39a5b6cf39e474f
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 eea196e79e4a398e41945637a6bfaca0e7455726525fc4779df5f5e526b7415d

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel