POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Buckland Marsh Solar Park

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:c21d3463c9fdc54610b8f762 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:57377484d33e878cf444cd75
to_kindpower_object
to_idneso:connection_site:c21d3463c9fdc54610b8f762
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:298

Sources EV-e203890d4e53ab2f852d39e6
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 fbc8d41b8d1ed39c7f0b13eec4b4d0b423adbe7302828f59d3ec89bdbc19ebbe

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Buckland Marsh Solar Park

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-e203890d4e53ab2f852d39e6
MW Increase / Decrease280 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-e203890d4e53ab2f852d39e6
Cumulative Total Capacity (MW)280 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-e203890d4e53ab2f852d39e6
Detailed source fields
Original source fieldPublished value or condition
Project NameBuckland Marsh Solar Park
Customer NameArise Renewable Energy UK Limited
Connection SiteBotley West 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease280.00
Cumulative Total Capacity (MW)280.00
MW Effective From2033-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e000000ewwxAAA
Project NumberPRO-003695
GateNot obtained
Original textScoping
source_record_idcsv:row:298

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:298

Sources EV-e203890d4e53ab2f852d39e6
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 fbc8d41b8d1ed39c7f0b13eec4b4d0b423adbe7302828f59d3ec89bdbc19ebbe

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Buckland Marsh Solar Park

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBuckland Marsh Solar Park
Customer NameArise Renewable Energy UK Limited
Connection SiteBotley West 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease280.00
Cumulative Total Capacity (MW)280.00
MW Effective From2033-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e000000ewwxAAA
Project NumberPRO-003695
GateNot obtained
Original textScoping
source_record_idcsv:row:298

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:298

Sources EV-e203890d4e53ab2f852d39e6
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 fbc8d41b8d1ed39c7f0b13eec4b4d0b423adbe7302828f59d3ec89bdbc19ebbe

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel