POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Temple Oaks Renewable Energy Park

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:9cf0faeb4abdae217c65d50d · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:5672886345a7b7b5d2167219
to_kindpower_object
to_idneso:connection_site:9cf0faeb4abdae217c65d50d
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1960

Sources EV-dc48fa19b038d3ba68c2405b
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 8ddf16242139f7ecf035adfdc42aee28ad8a370b6e46ee8d5d3afb675a776dd9

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Temple Oaks Renewable Energy Park

Connection register · awaiting consents

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-dc48fa19b038d3ba68c2405b
MW Increase / Decrease240 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-dc48fa19b038d3ba68c2405b
Cumulative Total Capacity (MW)240 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-dc48fa19b038d3ba68c2405b
Detailed source fields
Original source fieldPublished value or condition
Project NameTemple Oaks Renewable Energy Park
Customer NameRIDGE CLEAN ENERGY LTD
Connection SiteBicker Fen GSP
StageNot obtained
MW Connected0.00
MW Increase / Decrease240.00
Cumulative Total Capacity (MW)240.00
MW Effective From2033-10-30
Project StatusAwaiting Consents
Agreement TypeEmbedded
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l4L0000005iXjQAI
Project NumberPRO-002118
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:1960

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1960

Sources EV-dc48fa19b038d3ba68c2405b
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 8ddf16242139f7ecf035adfdc42aee28ad8a370b6e46ee8d5d3afb675a776dd9

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Temple Oaks Renewable Energy Park

project stage · awaiting consents

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameTemple Oaks Renewable Energy Park
Customer NameRIDGE CLEAN ENERGY LTD
Connection SiteBicker Fen GSP
StageNot obtained
MW Connected0.00
MW Increase / Decrease240.00
Cumulative Total Capacity (MW)240.00
MW Effective From2033-10-30
Project StatusAwaiting Consents
Agreement TypeEmbedded
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l4L0000005iXjQAI
Project NumberPRO-002118
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:1960

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1960

Sources EV-dc48fa19b038d3ba68c2405b
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 8ddf16242139f7ecf035adfdc42aee28ad8a370b6e46ee8d5d3afb675a776dd9

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel