POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

East Claydon Green Energy Centre

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:049e9e6c6349015b180bf714 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:54c99dd131155571018d3582
to_kindpower_object
to_idneso:connection_site:049e9e6c6349015b180bf714
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:658

Sources EV-477b0d59be821d9193139b89
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 d3ec24d259a9e3f6ba2cff8597d82a11f3e732aa3112234c602b97ff8eced774

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

East Claydon Green Energy Centre

Connection register · awaiting consents

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-477b0d59be821d9193139b89
MW Increase / Decrease1025 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-477b0d59be821d9193139b89
Cumulative Total Capacity (MW)2050 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-477b0d59be821d9193139b89
Detailed source fields
Original source fieldPublished value or condition
Project NameEast Claydon Green Energy Centre
Customer NameEAST CLAYDON GREEN NG LIMITED
Connection SiteEast Claydon 400kV Substation
Stage2.00
MW Connected0.00
MW Increase / Decrease1025.00
Cumulative Total Capacity (MW)2050.00
MW Effective From2038-10-31
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TONGET
Plant TypeDemand;Energy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l4L0000005ivLQAQ
Project NumberPRO-002383-2
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:658

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:658

Sources EV-477b0d59be821d9193139b89
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 d3ec24d259a9e3f6ba2cff8597d82a11f3e732aa3112234c602b97ff8eced774

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

East Claydon Green Energy Centre

project stage · awaiting consents

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameEast Claydon Green Energy Centre
Customer NameEAST CLAYDON GREEN NG LIMITED
Connection SiteEast Claydon 400kV Substation
Stage2.00
MW Connected0.00
MW Increase / Decrease1025.00
Cumulative Total Capacity (MW)2050.00
MW Effective From2038-10-31
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TONGET
Plant TypeDemand;Energy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l4L0000005ivLQAQ
Project NumberPRO-002383-2
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:658

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:658

Sources EV-477b0d59be821d9193139b89
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 d3ec24d259a9e3f6ba2cff8597d82a11f3e732aa3112234c602b97ff8eced774

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel