POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Rampion Extension Offshore Wind Farm

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:aa5b734a3e61f9d7b48ac700 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:50582b87efa5e3e9afab76c4
to_kindpower_object
to_idneso:connection_site:aa5b734a3e61f9d7b48ac700
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1701

Sources EV-5a33d92c9f6b15cbae727afe
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 1213e834d0f77b4caf95be967f71644193cb26677b29accc2311adcabd29baa8

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Rampion Extension Offshore Wind Farm

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-5a33d92c9f6b15cbae727afe
MW Increase / Decrease1200 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-5a33d92c9f6b15cbae727afe
Cumulative Total Capacity (MW)1200 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-5a33d92c9f6b15cbae727afe
Detailed source fields
Original source fieldPublished value or condition
Project NameRampion Extension Offshore Wind Farm
Customer NameRAMPION EXTENSION DEVELOPMENT LIMITED
Connection SiteBolney 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease1200.00
Cumulative Total Capacity (MW)1200.00
MW Effective From2029-12-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeWind Offshore
Project IDa0l4L0000005io1QAA
Project NumberPRO-000467
GateNot obtained
Original textScoping
source_record_idcsv:row:1701

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1701

Sources EV-5a33d92c9f6b15cbae727afe
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 1213e834d0f77b4caf95be967f71644193cb26677b29accc2311adcabd29baa8

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Rampion Extension Offshore Wind Farm

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameRampion Extension Offshore Wind Farm
Customer NameRAMPION EXTENSION DEVELOPMENT LIMITED
Connection SiteBolney 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease1200.00
Cumulative Total Capacity (MW)1200.00
MW Effective From2029-12-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeWind Offshore
Project IDa0l4L0000005io1QAA
Project NumberPRO-000467
GateNot obtained
Original textScoping
source_record_idcsv:row:1701

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1701

Sources EV-5a33d92c9f6b15cbae727afe
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 1213e834d0f77b4caf95be967f71644193cb26677b29accc2311adcabd29baa8

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel