POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Burghfield

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:156fd295772c723dd875a3af · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:4e9b86abfa61c29c5dc914d0
to_kindpower_object
to_idneso:connection_site:156fd295772c723dd875a3af
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:306

Sources EV-1fb1aa9d73af64dbf6d82e90
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 4954b4e5cb3a8dc7f3f06a67ded05a5dbc14325339e7435d321ef5c8ffc6483d

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Burghfield

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected47 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-1fb1aa9d73af64dbf6d82e90
MW Increase / Decrease0 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-1fb1aa9d73af64dbf6d82e90
Cumulative Total Capacity (MW)47 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-1fb1aa9d73af64dbf6d82e90
Detailed source fields
Original source fieldPublished value or condition
Project NameBurghfield
Customer NameSSE GENERATION LIMITED
Connection SiteBramley 400kV Substation
StageNot obtained
MW Connected47.00
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)47.00
MW Effective FromNot obtained
Project StatusBuilt
Agreement TypeEmbedded
HOST TONGET
Plant TypeThermal
Project IDa0l4L0000005iXnQAI
Project NumberPRO-000870
GateNot obtained
Original textBuilt
source_record_idcsv:row:306

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:306

Sources EV-1fb1aa9d73af64dbf6d82e90
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 4954b4e5cb3a8dc7f3f06a67ded05a5dbc14325339e7435d321ef5c8ffc6483d

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Burghfield

project stage · built

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBurghfield
Customer NameSSE GENERATION LIMITED
Connection SiteBramley 400kV Substation
StageNot obtained
MW Connected47.00
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)47.00
MW Effective FromNot obtained
Project StatusBuilt
Agreement TypeEmbedded
HOST TONGET
Plant TypeThermal
Project IDa0l4L0000005iXnQAI
Project NumberPRO-000870
GateNot obtained
Original textBuilt
source_record_idcsv:row:306

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:306

Sources EV-1fb1aa9d73af64dbf6d82e90
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 4954b4e5cb3a8dc7f3f06a67ded05a5dbc14325339e7435d321ef5c8ffc6483d

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel