POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Alcemi Bramford Battery Energy Storage Facility Phase 2

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:1e08e378e1333930ed934372 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:47d5e57f706a914f61650aed
to_kindpower_object
to_idneso:connection_site:1e08e378e1333930ed934372
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:46

Sources EV-a7aad22ada7b5d298067b632
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 60647ba6ce608c26f0a37149fed47cf97c073a7ea8d129cc94cff76052f3399f

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Alcemi Bramford Battery Energy Storage Facility Phase 2

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-a7aad22ada7b5d298067b632
MW Increase / Decrease1000 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-a7aad22ada7b5d298067b632
Cumulative Total Capacity (MW)1000 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-a7aad22ada7b5d298067b632
Detailed source fields
Original source fieldPublished value or condition
Project NameAlcemi Bramford Battery Energy Storage Facility Phase 2
Customer NameALCEMI STORAGE DEVELOPMENTS 1 LIMITED
Connection SiteSouth Anglia Connection Node A 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease1000.00
Cumulative Total Capacity (MW)1000.00
MW Effective From2034-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System
Project IDa0l8e000000TPHYAA4
Project NumberPRO-003235
Gate1
Original textScoping
source_record_idcsv:row:46

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:46

Sources EV-a7aad22ada7b5d298067b632
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 60647ba6ce608c26f0a37149fed47cf97c073a7ea8d129cc94cff76052f3399f

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Alcemi Bramford Battery Energy Storage Facility Phase 2

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameAlcemi Bramford Battery Energy Storage Facility Phase 2
Customer NameALCEMI STORAGE DEVELOPMENTS 1 LIMITED
Connection SiteSouth Anglia Connection Node A 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease1000.00
Cumulative Total Capacity (MW)1000.00
MW Effective From2034-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System
Project IDa0l8e000000TPHYAA4
Project NumberPRO-003235
Gate1
Original textScoping
source_record_idcsv:row:46

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:46

Sources EV-a7aad22ada7b5d298067b632
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 60647ba6ce608c26f0a37149fed47cf97c073a7ea8d129cc94cff76052f3399f

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel