POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Hirfynydd and Mynydd Drumaur

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:cc69df278756039708d7549b · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:45cd8e312ff462fbb7987290
to_kindpower_object
to_idneso:connection_site:cc69df278756039708d7549b
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1018

Sources EV-024feefd21086b018e849854
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 1fc0897ed3b103086f039a69e7f653c424e2302175e2230ddc1ce6393dfc8280

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Hirfynydd and Mynydd Drumaur

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-024feefd21086b018e849854
MW Increase / Decrease19.1 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-024feefd21086b018e849854
Cumulative Total Capacity (MW)249 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-024feefd21086b018e849854
Detailed source fields
Original source fieldPublished value or condition
Project NameHirfynydd and Mynydd Drumaur
Customer NameEDF ENERGY RENEWABLES LIMITED
Connection SiteSwansea North 400kV Substation
Stage2.00
MW Connected0.00
MW Increase / Decrease19.10
Cumulative Total Capacity (MW)249.00
MW Effective From2036-12-06
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Project IDa0l4L0000005iw9QAA
Project NumberPRO-001899-2
Gate1
Original textScoping
source_record_idcsv:row:1018

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1018

Sources EV-024feefd21086b018e849854
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 1fc0897ed3b103086f039a69e7f653c424e2302175e2230ddc1ce6393dfc8280

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Hirfynydd and Mynydd Drumaur

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameHirfynydd and Mynydd Drumaur
Customer NameEDF ENERGY RENEWABLES LIMITED
Connection SiteSwansea North 400kV Substation
Stage2.00
MW Connected0.00
MW Increase / Decrease19.10
Cumulative Total Capacity (MW)249.00
MW Effective From2036-12-06
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Project IDa0l4L0000005iw9QAA
Project NumberPRO-001899-2
Gate1
Original textScoping
source_record_idcsv:row:1018

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1018

Sources EV-024feefd21086b018e849854
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 1fc0897ed3b103086f039a69e7f653c424e2302175e2230ddc1ce6393dfc8280

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel