This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Natpower Thimbleby Green Energy Park

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:9eca113735d1a031e1762f24 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:3dfa55a4e48167ffcbe7f4f3
to_kindpower_object
to_idneso:connection_site:9eca113735d1a031e1762f24
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1483

Sources EV-cd151aa60e32b4f93d02b872
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 bdaef25c1c08542b53ac2ebd946820f3da0afba3317e37c2c2d8ffcaaf2016bf

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Natpower Thimbleby Green Energy Park

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-cd151aa60e32b4f93d02b872
MW Increase / Decrease1000 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-cd151aa60e32b4f93d02b872
Cumulative Total Capacity (MW)1000 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-cd151aa60e32b4f93d02b872
Detailed source fields
Original source fieldPublished value or condition
Project NameNatpower Thimbleby Green Energy Park
Customer NameMOWBRAY ENERGY PARK LIMITED
Connection SiteTrent Valley South Connection Node B 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease1000.00
Cumulative Total Capacity (MW)1000.00
MW Effective From2033-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System
Project IDa0l8e000000exh7AAA
Project NumberPRO-003740
Gate1
Original textScoping
source_record_idcsv:row:1483

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1483

Sources EV-cd151aa60e32b4f93d02b872
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 bdaef25c1c08542b53ac2ebd946820f3da0afba3317e37c2c2d8ffcaaf2016bf

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Natpower Thimbleby Green Energy Park

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameNatpower Thimbleby Green Energy Park
Customer NameMOWBRAY ENERGY PARK LIMITED
Connection SiteTrent Valley South Connection Node B 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease1000.00
Cumulative Total Capacity (MW)1000.00
MW Effective From2033-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System
Project IDa0l8e000000exh7AAA
Project NumberPRO-003740
Gate1
Original textScoping
source_record_idcsv:row:1483

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1483

Sources EV-cd151aa60e32b4f93d02b872
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 bdaef25c1c08542b53ac2ebd946820f3da0afba3317e37c2c2d8ffcaaf2016bf

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel