POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Teindland Wind Farm

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:de98d5a236c498901bca5f49 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:3d2eeacf6102da91e76df137
to_kindpower_object
to_idneso:connection_site:de98d5a236c498901bca5f49
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1959

Sources EV-210cf032bbff4adc3bc761de
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 820a1010ad46e75806839d41cd3a401255c73e7ab264efa3671403eeb6eb20e7

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Teindland Wind Farm

Connection register · awaiting consents

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-210cf032bbff4adc3bc761de
MW Increase / Decrease112.2 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-210cf032bbff4adc3bc761de
Cumulative Total Capacity (MW)112.2 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-210cf032bbff4adc3bc761de
Detailed source fields
Original source fieldPublished value or condition
Project NameTeindland Wind Farm
Customer NameTEINDLAND WIND FARM LIMITED
Connection SiteBlackhillock substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease112.20
Cumulative Total Capacity (MW)112.20
MW Effective From2029-09-28
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TOSHET
Plant TypeDemand;Wind Onshore
Project IDa0l4L0000005iNkQAI
Project NumberPRO-001821
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:1959

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1959

Sources EV-210cf032bbff4adc3bc761de
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 820a1010ad46e75806839d41cd3a401255c73e7ab264efa3671403eeb6eb20e7

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Teindland Wind Farm

project stage · awaiting consents

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameTeindland Wind Farm
Customer NameTEINDLAND WIND FARM LIMITED
Connection SiteBlackhillock substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease112.20
Cumulative Total Capacity (MW)112.20
MW Effective From2029-09-28
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TOSHET
Plant TypeDemand;Wind Onshore
Project IDa0l4L0000005iNkQAI
Project NumberPRO-001821
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:1959

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1959

Sources EV-210cf032bbff4adc3bc761de
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 820a1010ad46e75806839d41cd3a401255c73e7ab264efa3671403eeb6eb20e7

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel