POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Iron Acton

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:e9da9c7a63fbdc52147d9c3b · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:3946e7f42ee1ec3899432d72
to_kindpower_object
to_idneso:connection_site:e9da9c7a63fbdc52147d9c3b
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1082

Sources EV-d1b6af3edcce0df72ecc24df
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 59291ee66ac9f19f22aee519dc634826ba16163f370be54bc32adcae20260332

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Iron Acton

Connection register · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-d1b6af3edcce0df72ecc24df
MW Increase / Decrease20.6 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-d1b6af3edcce0df72ecc24df
Cumulative Total Capacity (MW)120 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-d1b6af3edcce0df72ecc24df
Detailed source fields
Original source fieldPublished value or condition
Project NameIron Acton
Customer NameIRON ACTON GREEN LIMITED
Connection Site132kV bay at Iron Acton Substation
Stage2.00
MW Connected0.00
MW Increase / Decrease20.60
Cumulative Total Capacity (MW)120.00
MW Effective From2026-09-30
Project StatusUnder Construction/Commissioning
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l4L0000005iodQAA
Project NumberPRO-000491-2
GateNot obtained
Original textUnder Construction/Commissioning
source_record_idcsv:row:1082

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1082

Sources EV-d1b6af3edcce0df72ecc24df
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 59291ee66ac9f19f22aee519dc634826ba16163f370be54bc32adcae20260332

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Iron Acton

project stage · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameIron Acton
Customer NameIRON ACTON GREEN LIMITED
Connection Site132kV bay at Iron Acton Substation
Stage2.00
MW Connected0.00
MW Increase / Decrease20.60
Cumulative Total Capacity (MW)120.00
MW Effective From2026-09-30
Project StatusUnder Construction/Commissioning
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l4L0000005iodQAA
Project NumberPRO-000491-2
GateNot obtained
Original textUnder Construction/Commissioning
source_record_idcsv:row:1082

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1082

Sources EV-d1b6af3edcce0df72ecc24df
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 59291ee66ac9f19f22aee519dc634826ba16163f370be54bc32adcae20260332

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel