POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Greengage Farm

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:0acaabfb0cc0c5e6a597fc18 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:3184bf6022f67db8b23c1541
to_kindpower_object
to_idneso:connection_site:0acaabfb0cc0c5e6a597fc18
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:918

Sources EV-2cd4279b51ccc50cc53d1a46
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 20fca19c8a2e7536ab955e6ce32d98904ed65e4dfef8d6491c704adc25e2cf8d

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Greengage Farm

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-2cd4279b51ccc50cc53d1a46
MW Increase / Decrease500 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-2cd4279b51ccc50cc53d1a46
Cumulative Total Capacity (MW)500 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-2cd4279b51ccc50cc53d1a46
Detailed source fields
Original source fieldPublished value or condition
Project NameGreengage Farm
Customer NameRenewable Energy Systems Limited
Connection SiteBiggleswade 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease500.00
Cumulative Total Capacity (MW)500.00
MW Effective From2034-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e0000012jPcAAI
Project NumberPRO-004675
Gate1
Original textScoping
source_record_idcsv:row:918

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:918

Sources EV-2cd4279b51ccc50cc53d1a46
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 20fca19c8a2e7536ab955e6ce32d98904ed65e4dfef8d6491c704adc25e2cf8d

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Greengage Farm

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameGreengage Farm
Customer NameRenewable Energy Systems Limited
Connection SiteBiggleswade 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease500.00
Cumulative Total Capacity (MW)500.00
MW Effective From2034-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e0000012jPcAAI
Project NumberPRO-004675
Gate1
Original textScoping
source_record_idcsv:row:918

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:918

Sources EV-2cd4279b51ccc50cc53d1a46
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 20fca19c8a2e7536ab955e6ce32d98904ed65e4dfef8d6491c704adc25e2cf8d

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel