POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Ayre (ex Cluaran Ear - Thuath) Offshore Wind Farm

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:a2b52bc84569c7b15832818a · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:30e04207a51cd6608a068ef8
to_kindpower_object
to_idneso:connection_site:a2b52bc84569c7b15832818a
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:104

Sources EV-01302c2648d44934f4be1b59
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 b4b7354cde6bfe6365133c048782df45b0a9c465579f307a93a6a8f86e3746cf

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Ayre (ex Cluaran Ear - Thuath) Offshore Wind Farm

Connection register · awaiting consents

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-01302c2648d44934f4be1b59
MW Increase / Decrease1008 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-01302c2648d44934f4be1b59
Cumulative Total Capacity (MW)1008 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-01302c2648d44934f4be1b59
Detailed source fields
Original source fieldPublished value or condition
Project NameAyre (ex Cluaran Ear - Thuath) Offshore Wind Farm
Customer NameAYRE OFFSHORE WIND FARM LIMITED
Connection SiteBanniskirk 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease1008.00
Cumulative Total Capacity (MW)1008.00
MW Effective From2033-10-31
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TOSHET
Plant TypeWind Offshore
Project IDa0l4L0000005ix0QAA
Project NumberPRO-002100
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:104

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:104

Sources EV-01302c2648d44934f4be1b59
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 b4b7354cde6bfe6365133c048782df45b0a9c465579f307a93a6a8f86e3746cf

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Ayre (ex Cluaran Ear - Thuath) Offshore Wind Farm

project stage · awaiting consents

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameAyre (ex Cluaran Ear - Thuath) Offshore Wind Farm
Customer NameAYRE OFFSHORE WIND FARM LIMITED
Connection SiteBanniskirk 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease1008.00
Cumulative Total Capacity (MW)1008.00
MW Effective From2033-10-31
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TOSHET
Plant TypeWind Offshore
Project IDa0l4L0000005ix0QAA
Project NumberPRO-002100
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:104

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:104

Sources EV-01302c2648d44934f4be1b59
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 b4b7354cde6bfe6365133c048782df45b0a9c465579f307a93a6a8f86e3746cf

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel