POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Alcemi Bramford Battery Energy Storage Facility

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:da41a5b95c5c487ad13c3733 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:2fa6a618b8d42731c1547e62
to_kindpower_object
to_idneso:connection_site:da41a5b95c5c487ad13c3733
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:45

Sources EV-c96bbc3239fd4d390b50e7d3
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 e1d90eaeebdb8d5903329f643a13d6b00f109a0d5d436d39065e523f1c0ef23d

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Alcemi Bramford Battery Energy Storage Facility

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-c96bbc3239fd4d390b50e7d3
MW Increase / Decrease500 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-c96bbc3239fd4d390b50e7d3
Cumulative Total Capacity (MW)500 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-c96bbc3239fd4d390b50e7d3
Detailed source fields
Original source fieldPublished value or condition
Project NameAlcemi Bramford Battery Energy Storage Facility
Customer NameALCEMI STORAGE DEVELOPMENTS 1 LIMITED
Connection SiteBramford 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease500.00
Cumulative Total Capacity (MW)500.00
MW Effective From2030-10-30
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System
Project IDa0l4L0000005iaqQAA
Project NumberPRO-001416
Gate1
Original textScoping
source_record_idcsv:row:45

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:45

Sources EV-c96bbc3239fd4d390b50e7d3
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 e1d90eaeebdb8d5903329f643a13d6b00f109a0d5d436d39065e523f1c0ef23d

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Alcemi Bramford Battery Energy Storage Facility

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameAlcemi Bramford Battery Energy Storage Facility
Customer NameALCEMI STORAGE DEVELOPMENTS 1 LIMITED
Connection SiteBramford 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease500.00
Cumulative Total Capacity (MW)500.00
MW Effective From2030-10-30
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System
Project IDa0l4L0000005iaqQAA
Project NumberPRO-001416
Gate1
Original textScoping
source_record_idcsv:row:45

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:45

Sources EV-c96bbc3239fd4d390b50e7d3
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 e1d90eaeebdb8d5903329f643a13d6b00f109a0d5d436d39065e523f1c0ef23d

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel