POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Braybrooke Solar and Battery Connection

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:34d64e2b95075c9e173e0a53 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:276d684f807a1c4617550eb6
to_kindpower_object
to_idneso:connection_site:34d64e2b95075c9e173e0a53
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:268

Sources EV-80d955a85fbad8e85c7b5d72
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 6a5f0e87ad97117aa2ccbb7cb01a5e6ea69dff7bd8f6f87174aed8a4c68b839f

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Braybrooke Solar and Battery Connection

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-80d955a85fbad8e85c7b5d72
MW Increase / Decrease500 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-80d955a85fbad8e85c7b5d72
Cumulative Total Capacity (MW)500 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-80d955a85fbad8e85c7b5d72
Detailed source fields
Original source fieldPublished value or condition
Project NameBraybrooke Solar and Battery Connection
Customer NameIrena BESS LIMITED
Connection SiteBraybrooke (Network Rail) GSP
StageNot obtained
MW Connected0.00
MW Increase / Decrease500.00
Cumulative Total Capacity (MW)500.00
MW Effective From2031-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l4L0000005itZQAQ
Project NumberPRO-002207
GateNot obtained
Original textScoping
source_record_idcsv:row:268

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:268

Sources EV-80d955a85fbad8e85c7b5d72
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 6a5f0e87ad97117aa2ccbb7cb01a5e6ea69dff7bd8f6f87174aed8a4c68b839f

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Braybrooke Solar and Battery Connection

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBraybrooke Solar and Battery Connection
Customer NameIrena BESS LIMITED
Connection SiteBraybrooke (Network Rail) GSP
StageNot obtained
MW Connected0.00
MW Increase / Decrease500.00
Cumulative Total Capacity (MW)500.00
MW Effective From2031-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l4L0000005itZQAQ
Project NumberPRO-002207
GateNot obtained
Original textScoping
source_record_idcsv:row:268

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:268

Sources EV-80d955a85fbad8e85c7b5d72
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 6a5f0e87ad97117aa2ccbb7cb01a5e6ea69dff7bd8f6f87174aed8a4c68b839f

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel