Amersham Main

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:b17d54b2e3cb2c496294ed2a · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:22f187235e4933e65e45cf0b
to_kindpower_object
to_idneso:connection_site:b17d54b2e3cb2c496294ed2a
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:64

Sources EV-db5454735658d681073a1f94
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 bf497a935495eec3aa6efe1b4c2ac63153d4fb1fb0109492d29a5d1c54579b28

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Amersham Main

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-db5454735658d681073a1f94
MW Increase / Decrease1000 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-db5454735658d681073a1f94
Cumulative Total Capacity (MW)1000 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-db5454735658d681073a1f94
Detailed source fields
Original source fieldPublished value or condition
Project NameAmersham Main
Customer NameAmersham 10 Renewables Limited
Connection SiteLondon North West Connection Node A 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease1000.00
Cumulative Total Capacity (MW)1000.00
MW Effective From2037-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e000000TPQWAA4
Project NumberPRO-003404
GateNot obtained
Original textScoping
source_record_idcsv:row:64

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:64

Sources EV-db5454735658d681073a1f94
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 bf497a935495eec3aa6efe1b4c2ac63153d4fb1fb0109492d29a5d1c54579b28

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Amersham Main

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameAmersham Main
Customer NameAmersham 10 Renewables Limited
Connection SiteLondon North West Connection Node A 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease1000.00
Cumulative Total Capacity (MW)1000.00
MW Effective From2037-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e000000TPQWAA4
Project NumberPRO-003404
GateNot obtained
Original textScoping
source_record_idcsv:row:64

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:64

Sources EV-db5454735658d681073a1f94
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 bf497a935495eec3aa6efe1b4c2ac63153d4fb1fb0109492d29a5d1c54579b28

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel