POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Cottam-Ryhall Solar & BESS

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:9eca113735d1a031e1762f24 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:1e25b83a488abba5e65411be
to_kindpower_object
to_idneso:connection_site:9eca113735d1a031e1762f24
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:475

Sources EV-f7fabb30b431c53c2d126626
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 b1cfe15677fdb83f4be16f3b51c42e54b5b4119b4553ab2e344468c1d8ba426a

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Cottam-Ryhall Solar & BESS

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-f7fabb30b431c53c2d126626
MW Increase / Decrease400 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-f7fabb30b431c53c2d126626
Cumulative Total Capacity (MW)400 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-f7fabb30b431c53c2d126626
Detailed source fields
Original source fieldPublished value or condition
Project NameCottam-Ryhall Solar & BESS
Customer NameCRH RENEWABLES LIMITED
Connection SiteTrent Valley South Connection Node B 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease400.00
Cumulative Total Capacity (MW)400.00
MW Effective From2034-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e000001HozEAAS
Project NumberPRO-004100
Gate1
Original textScoping
source_record_idcsv:row:475

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:475

Sources EV-f7fabb30b431c53c2d126626
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 b1cfe15677fdb83f4be16f3b51c42e54b5b4119b4553ab2e344468c1d8ba426a

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Cottam-Ryhall Solar & BESS

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameCottam-Ryhall Solar & BESS
Customer NameCRH RENEWABLES LIMITED
Connection SiteTrent Valley South Connection Node B 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease400.00
Cumulative Total Capacity (MW)400.00
MW Effective From2034-10-31
Project StatusScoping
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e000001HozEAAS
Project NumberPRO-004100
Gate1
Original textScoping
source_record_idcsv:row:475

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:475

Sources EV-f7fabb30b431c53c2d126626
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 b1cfe15677fdb83f4be16f3b51c42e54b5b4119b4553ab2e344468c1d8ba426a

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel