POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Cilfynydd

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:44e11e3458a3e2ba0feeb2f8 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:1d6a278cad6a78739d6341bb
to_kindpower_object
to_idneso:connection_site:44e11e3458a3e2ba0feeb2f8
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:401

Sources EV-56a9f454295208e02d5b1081
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 0993bcde4d7d0d3a1dbbca74f5651d96caa47883d8404ed055f20faa8c86650f

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Cilfynydd

Connection register · awaiting consents

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-56a9f454295208e02d5b1081
MW Increase / Decrease400 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-56a9f454295208e02d5b1081
Cumulative Total Capacity (MW)400 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-56a9f454295208e02d5b1081
Detailed source fields
Original source fieldPublished value or condition
Project NameCilfynydd
Customer NameENSO GREEN HOLDINGS X LIMITED
Connection SiteCilfynydd 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease400.00
Cumulative Total Capacity (MW)400.00
MW Effective From2030-10-31
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Project IDa0l4L0000005idlQAA
Project NumberPRO-002088
Gate1
Original textAwaiting Consents
source_record_idcsv:row:401

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:401

Sources EV-56a9f454295208e02d5b1081
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 0993bcde4d7d0d3a1dbbca74f5651d96caa47883d8404ed055f20faa8c86650f

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Cilfynydd

project stage · awaiting consents

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameCilfynydd
Customer NameENSO GREEN HOLDINGS X LIMITED
Connection SiteCilfynydd 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease400.00
Cumulative Total Capacity (MW)400.00
MW Effective From2030-10-31
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar);Wind Onshore
Project IDa0l4L0000005idlQAA
Project NumberPRO-002088
Gate1
Original textAwaiting Consents
source_record_idcsv:row:401

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:401

Sources EV-56a9f454295208e02d5b1081
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 0993bcde4d7d0d3a1dbbca74f5651d96caa47883d8404ed055f20faa8c86650f

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel