POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Cerulean Winds INTOG 1

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:b4e06a1ea9b16421fb90a8b9 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:190da61c6af8415ad4816ded
to_kindpower_object
to_idneso:connection_site:b4e06a1ea9b16421fb90a8b9
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:382

Sources EV-552331ee14113199ef074218
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 c6c8cf7e25a4d605aef247cd400bdd759ba8304b913b331451e513eebee61f1f

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Cerulean Winds INTOG 1

Connection register · awaiting consents

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-552331ee14113199ef074218
MW Increase / Decrease600 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-552331ee14113199ef074218
Cumulative Total Capacity (MW)600 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-552331ee14113199ef074218
Detailed source fields
Original source fieldPublished value or condition
Project NameCerulean Winds INTOG 1
Customer NameCERULEAN WINDS LIMITED
Connection SiteHurlie 400kV substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease600.00
Cumulative Total Capacity (MW)600.00
MW Effective From2033-10-31
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TOSHET
Plant TypeDemand;Wind Offshore
Project IDa0l8e000001I31aAAC
Project NumberPRO-004330
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:382

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:382

Sources EV-552331ee14113199ef074218
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 c6c8cf7e25a4d605aef247cd400bdd759ba8304b913b331451e513eebee61f1f

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Cerulean Winds INTOG 1

project stage · awaiting consents

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameCerulean Winds INTOG 1
Customer NameCERULEAN WINDS LIMITED
Connection SiteHurlie 400kV substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease600.00
Cumulative Total Capacity (MW)600.00
MW Effective From2033-10-31
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TOSHET
Plant TypeDemand;Wind Offshore
Project IDa0l8e000001I31aAAC
Project NumberPRO-004330
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:382

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:382

Sources EV-552331ee14113199ef074218
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 c6c8cf7e25a4d605aef247cd400bdd759ba8304b913b331451e513eebee61f1f

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.