POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Swansea Greener Grid Park - Connection 1

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:cc69df278756039708d7549b · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:1465bea1be565dab9f1e7e5c
to_kindpower_object
to_idneso:connection_site:cc69df278756039708d7549b
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1937

Sources EV-69b7a9347d460a74ab233c51
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 11220980b5b0c04d0405d9282aff7e2ea54240642de66ef02950cf5a05bb2161

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Swansea Greener Grid Park - Connection 1

Connection register · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-69b7a9347d460a74ab233c51
MW Increase / Decrease12 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-69b7a9347d460a74ab233c51
Cumulative Total Capacity (MW)12 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-69b7a9347d460a74ab233c51
Detailed source fields
Original source fieldPublished value or condition
Project NameSwansea Greener Grid Park - Connection 1
Customer NameSWANSEA GRID SOLUTIONS LIMITED
Connection SiteSwansea North 400kV Substation
Stage1.00
MW Connected0.00
MW Increase / Decrease12.00
Cumulative Total Capacity (MW)12.00
MW Effective From2024-08-31
Project StatusUnder Construction/Commissioning
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;Reactive Compensation
Project IDa0l4L0000005ifaQAA
Project NumberPRO-001120-1
GateNot obtained
Original textUnder Construction/Commissioning
source_record_idcsv:row:1937

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1937

Sources EV-69b7a9347d460a74ab233c51
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 11220980b5b0c04d0405d9282aff7e2ea54240642de66ef02950cf5a05bb2161

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Swansea Greener Grid Park - Connection 1

project stage · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameSwansea Greener Grid Park - Connection 1
Customer NameSWANSEA GRID SOLUTIONS LIMITED
Connection SiteSwansea North 400kV Substation
Stage1.00
MW Connected0.00
MW Increase / Decrease12.00
Cumulative Total Capacity (MW)12.00
MW Effective From2024-08-31
Project StatusUnder Construction/Commissioning
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System;Reactive Compensation
Project IDa0l4L0000005ifaQAA
Project NumberPRO-001120-1
GateNot obtained
Original textUnder Construction/Commissioning
source_record_idcsv:row:1937

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1937

Sources EV-69b7a9347d460a74ab233c51
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 11220980b5b0c04d0405d9282aff7e2ea54240642de66ef02950cf5a05bb2161

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel